CityTX
Posted
Oct 1, 2026
Oct 22, 2026
Water and Sanitary Sewer Main Replacement Project RFP
The project includes the installation of pipe, valves, fire hydrants, pipe fittings, manholes, and trench and street repairs.
Description: Work includes approx 4,000 LF of 8” sanitary sewer; 14 EA of pre-cast manholes; 1,600 LF of 4" and 6" sanitary sewer services, including all materials, equipment, and labor to conduct project pipe installation, traffic control, excavation, backfill, compaction, trench paving, erosion control and all other work required for complete project.
City · ME, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Town of Orono.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 1, 2026
Oct 22, 2026
The project includes the installation of pipe, valves, fire hydrants, pipe fittings, manholes, and trench and street repairs.
CityWY
Posted
Oct 9, 2026
Oct 28, 2026
Install 8" PVC sanitary sewer main and 4" PVC extend and reconnect services with standard trenching, including manholes, fittings, and appurtenance replacement and upgrades. Install 6" and 8" PVC water main with standard trenching, 1" and 2" poly services, including fire hydrants, test stations, valves, fittings, curb stops, and appurtenance replacement and upgrades. Remove and replace 12" HDPE storm drain main with upgrades to inlets and appurtenances. Includes varying width of full depth pavement removal and replacement of asphaltic concrete paving, along with minor improvements to adjacent concrete curb and gutter, driveways, valley gutters, fillets, ADA ramps, sidewalk, hydrant splash pans, and landscaping as appropriate and identified in the plans.
CityNY
Posted
Sep 25, 2026
Oct 19, 2026
Sanitary Sewer Main Replacement - Schultz Way project shall include the removal and replacement of a section of existing public, gravity sanitary sewer main, in kind. The scope of work includes removal of the existing main line section, installation and removal of temporary sanitary bypass systems to ensure continued operation of the overall system, removal and reconnection of all existing sanitary sewer lateral service connections, installation of the new sanitary sewer main, connection to existing sanitary manholes and sewer laterals, subgrade improvements, pavement restoration.
CityOR
Posted
Oct 9, 2026
Nov 10, 2026
Install over 520 LF of 6" Class 52 DI water main with new gate valves and permanent blow-off assembly. Remove and replace a fire hydrant assembly, reconnect 10 water services, and abandon existing water main in-place. Work includes temp traffic control, TESC, rock excavation, roadway paving, and removal and replacement of existing landscaping and concrete surface.