CityNV
Posted
Oct 2, 2026
Nov 19, 2026
Central Ely Sewer Upgrade Project RFP
Work includes sewer upgrade.
Description: Work includes sewer upgrade.
City · NV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Ely.
Adjacent opportunities open for bidding right now.
CityNV
Posted
Oct 2, 2026
Nov 19, 2026
Work includes sewer upgrade.
CitySC
Posted
Oct 13, 2026
Nov 13, 2026
The new sewer line is proposed divert flow around the cell tower and its footprint. There will be an additional 2 new manholes. The project will also replace 1 existing manhole, and approx. 82 LF of existing sewer piping. All new pipe will match the existing piping and will be 8" dip. The project will utilize 60 LF of existing 14" casing to install the new 8" piping at the existing railroad tracks.
Evansville-Vanderburgh School Corporation
School DistrictIN
Posted
Oct 9, 2026
Nov 4, 2026
Stadium LED lighting upgrade.
CityMN
Posted
Sep 29, 2026
Dec 8, 2026
The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The major elements of work associated with the project include, but are not limited to: Demolition of an existing 400 GPM self-priming centrifugal pump, process pipe, fittings, valves, and appurtenances located within the existing pump station; Installation of a new intake structure and intake screen with a capacity of up to 2,000 GPM and located within Burntside Lake; Installation of a new 16", DR11, HDPE gravity transmission pipeline from the new intake screen to the existing pump station located on shore (approx. length of 525 LF); Installation of various buried site ductile iron pipe, fittings, valves, and appurtenances to connect the new intake pipe to the pump station process piping; Installation of various ductile iron process pipe, fittings, valves, and appurtenances inside of the existing pump station to connect the new pump to the suction and discharge piping; Installation of a new vacuum prime assisted self-priming centrifugal raw water pump with a rated capacity of 1,000 GPM including a new variable frequency drive and a new simplex air compressor for the vacuum assist system; Various electrical improvements to provide power to the new raw water pump and appurtenances; Various structural improvements to accommodate installation of the new pump and appurtenances including converting an existing exterior single door to a new double door as well as concrete equipment pads for the new equipment; and Related site work, site grading, rip rap at the shoreline, seeding, and restoration work.