DOC - KCIW Electrical Repairs

Description: The Project involves the installation of 15 kV circuits underground in direct buried conduit to create a loop feed connecting existing 15 kV Feeder One and Feeder Two that serve the KCIW campus. Primary system work also includes the replacement of select pad-mounted switches. In addition, the Project involves the replacement of the 277/480-volt main service entrance disconnect switch. The work of the Project must be performed in a sequenced effort coordinated with the KCIW. Associated work of the Project includes, but not limited to, trenching, backfill, pavement cuts and repairs, conduit installation (interior & exterior), handhole installation, and installation and termination of 600 volt and 15 kV rated cables. The work of the Project is within the KCIW security boundary. Additive Alternative #1: Replacement of medium-voltage outdoor pad-mounted gear PDS 3, PDS 4, and PDS 8 including associated terminations of 15 kV rated cables. Additive Alternative #2: Replacement of two 120/208-volt circuit breaker equipped panelboards in the KCIW Minimum Security Building #12.

Released
-
Closes
Oct 21, 2026(6 days left)

RFP documents

Solicitation files and supporting documents for this bid.

  • DOC - KCIW Electrical RepairsZIP
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts