CityGA
Posted
Sep 30, 2026
Oct 29, 2026
Description: The City of Millen seeks sealed bids to resurface approximately 0.3 miles of Palmer Row with asphalt. The work includes milling, applying a bituminous tack coat, installing an asphalt overlay, and striping the roadway; it must be completed within 45 calendar days. Funding is provided by LMIG funds and the City of Millen, and bid documents are on file with Parker Engineering, where copies may be obtained for $100.
City · GA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Millen.
Adjacent opportunities open for bidding right now.
CityGA
Posted
Sep 30, 2026
Oct 29, 2026
The City of Millen seeks sealed bids to resurface approximately 0.3 miles of Palmer Row with asphalt. The work includes milling, applying a bituminous tack coat, installing an asphalt overlay, and striping the roadway; it must be completed within 45 calendar days. Funding is provided by LMIG funds and the City of Millen, and bid documents are on file with Parker Engineering, where copies may be obtained for $100.
Colorado Springs School District 11
School DistrictCO
Posted
Oct 13, 2026
Nov 4, 2026
Project includes selective pre-abatement demolition and hazardous materials abatement
CountyGA
Posted
-
Nov 2, 2026
Dodge County Board of Commissioners seeks sealed bids for construction work on 10 county roads under its FY 2027 LMIG project. Work includes traffic control, asphalt deep patching and leveling, bituminous tack coat, 9.5 mm asphalt resurfacing, a 19 mm binder course, shoulder building and grassing, and restriping, following applicable GDOT specifications and current M.U.T.C.D. requirements. Bids are due by 2:00 p.m. on Monday, November 2, 2026; bidders must visit the site, provide a 5% bid bond, and submit one hard copy and one electronic version on a flash drive.
CityGA
Posted
Sep 1, 2026
Oct 27, 2026
Seeking proposals for the 2027 lmig asphalt resurfacing. Work is to include tack, striping and traffic control, manhole and valve extension rings to be installed, striping to match existing layout including r/r crossings, stop bars, crosswalks and long lines unless noted otherwise, ensure a smooth transition on all driveways and side streets.