Special DistrictMA
Posted
Jul 6, 2026
Dec 4, 2026
RFP - Construction Management Services for Corcoran Park Phase 1 - REBID
Construction management services for park.
Description: Monument Sign Project Phase 1.
City · OK, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Norman.
Adjacent opportunities open for bidding right now.
Special DistrictMA
Posted
Jul 6, 2026
Dec 4, 2026
Construction management services for park.
CityIN
Posted
Sep 25, 2026
Oct 27, 2026
Work includes removal of a portion of an existing 78-IN storm line, installation of baffle rings in another portion of the existing 78-IN storm pipe, installation of an energy dissipation chamber and new 78-storm pipe.
Soquel Creek Co Water District
Special DistrictCA
Posted
Oct 13, 2026
Nov 3, 2026
Transmission Main Project, Phase 1. Scope of work includes - 1,470 LF installation of 12" C-900 PVC water main w/12" valve and fittings; 1 LS abandonment of existing water main, valves, vaults, fire hydrant and blow-off; see attached files.
CityNJ
Posted
Jul 22, 2026
Nov 5, 2026
Replacement of 12 ADA curb ramps at various intersections in the Borough in the Base Bid. All ADA curbs will be replaced at Various location. The scope of work includes, but is not limited to: reconstruction of four (4) Type B catch basins; removal and replacement of 600 LF of 9x18 Portland cement concrete curbs; removal of 210 SY of existing concrete sidewalks and driveway aprons; installation of 220 SY of 4" thick, NJDOT Class B concrete sidewalks; installation of 100 SY of 6" thick, NJDOT Class B, reinforced, concrete ADA landings and aprons; installation of fifteen (15) cast-iron 2'x4' detectable warning surfaces; and, placement of 400 SY of top soil (4" thick), seed, and salt hay. Other work required includes sign. replacement and removal and replacement of traffic striping and markings.