CountyMD
Posted
Oct 1, 2026
Nov 4, 2026
Prequalification of Contractors for Utility System Repair and Replacement Services (Statements of Qualifications)
Prequalification of contractors for utility system repair and replacement services.
Description: The project will consist of design, demolition, construction, and commissioning services for the replacement of two overhead bridge cranes, rated at 150t each.
City · WA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyMD
Posted
Oct 1, 2026
Nov 4, 2026
Prequalification of contractors for utility system repair and replacement services.
Wyoming State Construction Department
State AgencyWY
Posted
Jan 2, 2026
Dec 31, 2026
The Wyoming State Construction Department is soliciting Statements of Qualifications from professional service providers across disciplines such as architecture, engineering, surveying, geotechnical, environmental, and related services. Approved statements may be kept on file for two years and multiple firms may be selected for future projects. This is a standing qualifications roster solicitation and is not a grant program, and it remains open through December 31, 2026.
CityAR
Posted
Oct 14, 2026
Oct 29, 2026
Provide various professional services including, but not limited to, financial advisory, engineering, grant administrative services, and economic development services.
San Francisco Public Utilities Commission
Special DistrictCA
Posted
Sep 23, 2026
Oct 22, 2026
Construction Manager/General Contractor (CM/GC) services: Install cofferdam in the reservoir to isolate the construction site from the reservoir. Install secant piles and engineered shoring as required to protect existing old powerhouse, gantry crane at new powerhouse, and all surrounding adjacent structures as well as roads. Procure and install 48" welded steel piping from existing 72" penstocks to future valve house vault through new right of way of Moccasin Camp. Repaving of existing roadways. Construction of underground concrete valve house vault with a depth of approx. 20-FT. Construction of concrete energy dissipation chambers. Construction of concrete water conveyance discharge structure. Existing water, sewer, and power utility relocation. Installation of owner furnished valves: two 48" diameter butterfly valves and two 48" diameter axial flow control valves with electric actuators and associated appurtenances. Installation of various new electrical and mechanical appurtenances including SCADA system. Procurement and installation of miscellaneous metals such as structural floor beams, stairs, grating, handrails, etc. Commissioning of large diameter valves, dewatering pumps, HVAC system, SCADA, etc.
Decision makers connected to this RFP from City of Seattle.