Genesee Intermediate School District
School DistrictMI
Posted
Oct 4, 2026
Oct 20, 2026
EKLC Gym & GCI Concrete Floor Remodel RFP
EKLC Gym & GCI concrete floor remodel.
Description: Project consists of bid categories: 03A – Concrete & Foundations; 05A – Structural Steel; 04A – Masonry; 06A – Rough and Finish Carpentry & General Trades; 07A – Roofing; 07B – Metal Wall Panels & Siding; 08A – Entrances and Storefronts, Windows, Glass & Glazing; 09A – Metal Studs, Gypboard & Acoustical Ceilings; 09B – Painting & Wall Coverings; 09C – Flooring; 21A – Fire Protection; 23A –HVAC & Plumbing; 26A – Electrical; 31A – Sitework, Utilities, Landscaping & Asphalt Paving.
SchoolDistrict · MI, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Genesee Intermediate School District
School DistrictMI
Posted
Oct 4, 2026
Oct 20, 2026
EKLC Gym & GCI concrete floor remodel.
CityWA
Posted
Oct 8, 2026
Oct 27, 2026
This package is for a Knox Box associated with Vancouver Fire Station 8; the project plan room lists package 1-32 as “KNOX BOX.” The Vancouver Fire Department describes a Knox Box as a secure key vault accessible to fire responders, used to expedite emergency response and provide access during alarm investigations. The broader Station 8 project involves renovation and expansion, seismic improvements, an interior remodel, and an addition for another engine company, with construction phased to keep station operations uninterrupted.
CityWA
Posted
Oct 8, 2026
Oct 27, 2026
Inline BP1-30 is the wall-protection subcontract package for the Vancouver Fire Station 8 seismic-upgrade project. The broader project includes seismic improvements, interior remodeling, and an addition to support another engine company, with construction phased to keep the fire station operating. The project description specifies prevailing-wage compliance and subcontractor bid and payment/performance bonds for subcontracts exceeding $300,000.
CityWA
Posted
Oct 8, 2026
Oct 27, 2026
This is the Inline BP1-35 appliance-installation package for Vancouver Fire Station 8. The associated station project includes seismic improvements, renovation and expansion, an interior remodel, and an addition to support an additional engine company. Construction is to be phased so fire-station operations can continue uninterrupted.
Decision makers connected to this RFP from Genesee Intermediate School District.