Posted
Sep 30, 2026
Oct 28, 2026
St. George River Bridge Replacement in the Town of Union
St. George River Bridge Replacement plus other incidental work.
Description: This RFP is for the St. George River Bridge Replacement plus other incidental work.
StateAgency · ME, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Posted
Sep 30, 2026
Oct 28, 2026
St. George River Bridge Replacement plus other incidental work.
Massachusetts Highway Division
State AgencyMA
Posted
Sep 19, 2026
Oct 20, 2026
The Massachusetts Department of Transportation is soliciting bids for the bridge replacement designated O-06-030, (ST 56) Leicester Road over the French River in Oxford, Massachusetts. The project involves replacing the bridge deck, improving roadway safety and operations, installing new guardrail and pavement markings, and providing six-foot shoulders for pedestrian and bicyclist access. The official record identifies this as a bridge-construction project rather than a grant program, with bids opening on October 20, 2026 at 2:00 PM.
CityMO
Posted
Sep 16, 2026
Oct 20, 2026
Work includes bridge replacement. Description: removal of improvements; abandonment; 1849 CY of class A excavation; 10972 CY of unclassified excavation; 8204 CY of embankment in place; 1541 CY of compacting embankment; 26.07 STA compacting in cut; 62 CY of concrete encasement; 1873 CY of class 3 excavation; 3875 SY of type 1 aggregate for base (4 in. Thick); 15,447 SY of type 5 aggregate for base (4 in. Thick); 392 SY of lightweight aggregate fill - sidewalk on bridge; 497 CY of lightweight aggregate fill - pavement on bridge; 123.50 CY of geofoam EPS 29; 111.60 ton of bituminous pavement mixture PG64-22, (BP-1); 100 gal of tack coat; 2291.60 SY of concrete pavement (6 in. Non-reinf); 15188.60 SY of concrete pavement (10 in. Non-reinf); 1 EA of MSD concrete collar 48 - inch pipe; 2 EA of MSD concrete collar 42 - inch pipe.
CityIA
Posted
Aug 26, 2026
Nov 4, 2026
The public improvement, upon which bids are requested, generally consists of existing bridge demolition, new cable stayed river bridge crossing, integral flood control system components, approach roadways, traffic improvements, sidewalks, trail reconstruction, utility reconstruction, and lighting.
Decision makers connected to this RFP from Maine Department of Transportation.