Closing soonAurora Harbor Drive Down Float
Description: Remove existing timber float, dredging sediment from a prism around a timber float, disposing of the dredged sediment at a nearby in-water disposal site, and reinstall existing timber float includes demolition, salvage and disposal, upland improvements, domestic water system, fire suppression system, approach dock addition, approach dock widening, existing approach dock modifications, transfer bridge 17'x140', bridge support float, bridge abutment assembly, float mooring vertical pile 24" dia. x 0.500" thick, float appurtenances, bridge abutment batter pile 16" dia. x 0.500" thick, install pile anode all types, concrete abutment, crane, utility shed, electrical system - power and lighting.