Hartford County Metropolitan District
Special DistrictCT
Posted
Oct 5, 2026
Nov 5, 2026
Flow Meter and Rain Gauge Replacement
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the removal and replacement of twelve (12) flow meters and control systems, three (3) of which will also require the removal and installation of combined sewer overflow level sensors, and the removal and installation of seven (7) rain gauges and control systems along with technical support, support equipment, and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details.
