CityOK
Posted
Sep 11, 2026
Oct 16, 2026
Description: Work includes traffic control 1 ls, construct 12" PVC water pipe 30 lf, construct 10" PVC water pipe 20 lf, construct 8" PVC water pipe 5450 lf, construct 6" PVC water pipe 40 lf, see outside link.
City · CA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Fullerton.
Adjacent opportunities open for bidding right now.
CityOK
Posted
Sep 11, 2026
Oct 16, 2026
Infrastructure rehabilitation and improvements, including unclassified excavation, pavement cutting and patching, concrete sidewalk installation/removal, curb modifications, cold milling bituminous pavement, bridge expansion joint rehabilitation, flashing beacon and sign assemblies, and urban right-of-way restoration.
CountyFL
Posted
Oct 1, 2026
Nov 6, 2026
Construct ±0.443 miles of rural section asphalt roadway with side ditches, conversion of an existing borrow pit to a storm water management facility, new storm sewer collection system, new water main and sanitary sewer force main, traffic signs and traffic paint/markings. Work includes 1 LS mobilization, 1 LS erosion control, 10.48 AC clearing & grubbing, 26,497 CY regular excavation, 50 SY 1" depth milling, 734 TN 1.5" asphaltic pavement, 1 EA storm inlet manholes, 72 SY 6" concrete pavement, 4,900 LF fencing, 10 EA single swing gate, 34,134 SY performance turf, 2 EA 8" gate valve, 4 EA fire hydrant, 291 LF 4" PVC sanitary sewer pipe.
West Calcasieu Port Harbor Terminal District
Special DistrictLA
Posted
Oct 1, 2026
Oct 29, 2026
Construction of a new aggregate laydown yard, aspahlt drive, site drainage, and fencing.
CityUT
Posted
Oct 11, 2026
Oct 28, 2026
This RFP is for a construction contract encompassing remodeling administrative offices, interior demolition, new gallery lighting, new wood floors, new carpets, main entry modifications, new ADA access entry, general mechanical and electrical modifications, ceiling modifications, and painting.