FederalOH
Posted
Oct 6, 2026
Oct 21, 2026
Seal, Rubber, Special- SPE7LX27U0064 (Request for Quotation)
Provide seal, rubber, special, NSN 5330009782232, Qty 13 UI Ea
Description: 2 Ea 2-layer static dissipative rubber matting for esd grounding in ansi / esd s20.20 compliant work areas for static control. 30"x 50' blue sku 53003050b. No substitutes.
SpecialDistrict · PA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
FederalOH
Posted
Oct 6, 2026
Oct 21, 2026
Provide seal, rubber, special, NSN 5330009782232, Qty 13 UI Ea
FederalVA
Posted
Oct 1, 2026
Oct 16, 2026
Provide wheel, solid rubber tire. NSN: 2530-00-293-5137 Part Number (P/N): 8706067.
Southeastern Pennsylvania Transportation Authority
Special DistrictPA
Posted
Oct 9, 2026
Oct 14, 2026
2 Ea nilfisk sleeve d70 antistat rubber component atex nilfisk #z7 20310; 1 Ea nilfisk connection tube d70 inox nilfisk #z7 22231; 3 Ea nilfisk air hose d70 50 m/m nilfisk #4072400229m; 2 Ea nilfisk sleeve d70 rubber nilfisk #z7 20003.
Environmental Protection Agency
FederalDC
Posted
Oct 7, 2026
Oct 21, 2026
Rubber mulch removal: FEELC has four RM fall zones, covering a total area of 4,715 square feet, with an estimated combined volume of 146 cubic yards of RM. These fall zones are enclosed by a 6-inch-tall safety surfacing border. Further details can be found in Section 6: Site Plan. The Contractor shall remove all RM from the designated fall zones, ensuring the removal is as complete as possible. Additionally, the Contractor shall remove all nearby RM from the playground that has spread out from the fall zones. All rubber mulch shall be collected in appropriate containers, such as dumpsters, and transported offsite for proper disposal in compliance with all local, state, and federal regulations. The Contractor shall be responsible for acquiring and transporting dumpsters in accordance with Section 3.1. Prior to commencing work, the Contractor shall coordinate with the COR to determine an appropriate staging location for the dumpsters. Additionally, the Contractor shall notify the COR in writing at least 72 hours before dumpster delivery to arrange for campus access. See attached file.
Decision makers connected to this RFP from Southeastern Pennsylvania Transportation Authority.