T or C Water System Performance Improvements 2 (WSPI-2)
Posted
Sep 24, 2026
Nov 12, 2026
Work includes approx 8,565 LF 12" PVC C-900 D-18 waterline with trenching and backfill; 150 LF 18" with casing pipe CIP by jack and bore; 211 LF 10" C-900 DR-18 FPVC waterline by directional bore; 4,405 LF dewatering of trench, CIP; 15,351 LF excavate and dispose of unsuitable material.

