City of Cibolo Public Safety Facility
Posted
Sep 23, 2026
Nov 3, 2026
Construction of the new Public Safety Facility. The City has obtained the land approx. 3.49 acres. The square footage of the one-story facility is 15,215 GSF. The City anticipates the following items will be included in the scope of the Project: concrete reinforced slab-on-grade with grade beams and spread footings, steel framing, steel roofing framing, metal decking, rigid insulation, standing seam metal roof, prefinished metal gutters and downspouts, batt insulation, composite hybrid metal walls panels, metal soffit panels, millwork, fluid applied water proofing, traffic coatings, fluid applied air barrier, fire stopping, roof accessories, hollow metal doors and frames, flush wood doors, four-fold door system, sectional OH doors, aluminum storefront framing, glazing, fire rated glazing assemblies, door hardware, mirrors, prefinished metal louvers, gypsum board assemblies, ceramic tile, acoustical ceiling and grid, interior and exterior painting, metal toilet partitions, operable wall partition, wall and door protection, toilet, bath and shower accessories, AEDs & cabinets, fire extinguisher and cabinets, flag poles, metal canopies, residential appliances, MEP systems and equipment, lighting, plumbing fixtures, lightning protection, fire suppression system, fire alarm system, commercial kitchen hood system, emergency generator and ATS, site clearing, grading, utility installation, landscaping, irrigation, reinforced concrete paving and striping, OSSF drip septic system and all other appurtenances necessary for the complete Project. See attached file.

